Work Photos
Manufacturing

Turning a gear rim on a vertical borer at Newcastle Engineering
Turning a gear rim on a vertical borer at Newcastle Engineering
Mining

MT Arthur – Secondary Crusher. There are 4 dovetails and each .dovetail contains 48 x 29.5 kg crusher shells. That is 192 shells to be removed with a sledge hammer and 5664 kg to lift off + 5664 in replacement shell for each shaft.
MT Arthur – Secondary Crusher. There are 4 dovetails and each .dovetail contains 48 x 29.5 kg crusher shells. That is 192 shells to be removed with a sledge hammer and 5664 kg to lift off + 5664 in replacement shell for each shaft.
Steel

Wire paying out onto Stelmore conveyor at the Newcastle Rod Mill
Wire paying out onto Stelmore conveyor at the Newcastle Rod Mill

Newcastle Rod Mill – The gearboxes that drive the rolls that roll the bar into rod and wire.
Newcastle Rod Mill – The gearboxes that drive the rolls that roll the bar into rod and wire.

Newcastle Rod Mill – Lifting fan into place on cooling tower.
Newcastle Rod Mill – Lifting fan into place on cooling tower.
Energy

Repairs to a transformer at Tallawarra Power Station
Repairs to a transformer at Tallawarra Power Station

Replacing Covers on the Condensator after refurbishment at Stanwell Power Station Qld.
Replacing Covers on the Condensator after refurbishment at Stanwell Power Station Qld.

Access cut into the boiler tubes at Liddell Power Station.
Access cut into the boiler tubes at Liddell Power Station.

A 680 MW steam Turbine at Bayswater Power Station NSW.
A 680 MW steam Turbine at Bayswater Power Station NSW.

A Riffle Box, part of the PF Fuel delivery system at Liddell Power Station.
A Riffle Box, part of the PF Fuel delivery system at Liddell Power Station.






















